top of page

How Long Does It Take to Build a New Home?

1 day ago
1 min read

The honest answer: it depends on the size, design, permits, site conditions, materials, and level of finish.

Here are practical planning ranges:


Pre-Construction: 4–8 Weeks

✅ Site assessment

✅ Design and engineering plans

✅ BOQ and cost planning

✅ Permit processing

✅ Financing and contract coordination

Construction Timeline

🏠 50–60 sqm straightforward home: approximately 90 days

🏠 60–90 sqm standard turnkey home: approximately 4–6 months

🏠 Large, two-storey, or highly customized home: approximately 6–12+ months

The timeline begins after approved plans, complete permits, signed contract, material selections, and site mobilization.


Delays may happen because of weather, material availability, design changes, site access, utility connections, or client-requested revisions.


At WallPro Systems & Construction Inc., we manage the process from design and BOQ preparation to construction, progress monitoring, punchlist, turnover, and warranty support.


📩 Message TIMELINE for a project-specific schedule.



Comments


Wallpro System & Construction Inc | All Rights Reserved.
Cagayan de Oro
bottom of page