See How WallPro Panels Saved ₱500,000 in Labor Cost on a Single Commercial Project

In construction, every peso counts—and every delay costs money. Traditional CHB construction requires heavy manpower, long curing times, and multiple steps that drive up labor expenses.

But a recent commercial project in Uptown Cagayan de Oro proved something game-changing:

By switching from CHB to WallPro Panels, the developer saved over ₱500,000 in labor costs—without sacrificing quality or safety.

This real-world case study reveals how WallPro is transforming Philippine construction economics.

The Project: A Commercial Building in Uptown CDO

  • Type: 4-storey commercial structure

  • Lot Size: 300 sqm

  • Original Plan: CHB wall system

  • Revised Plan: WallPro Panel System

🎯 Objective:

Reduce construction time and overall cost while meeting strict structural and aesthetic standards.

Where the Savings Came From

1. Faster Installation = Reduced Labor Days

  • CHB Method: 20 masons + 15 helpers over 90 days

  • WallPro Method: 8 installers + 4 helpers over 30 days

  • 60 days saved in wall installation alone

2. Minimal Plastering Required

  • CHB requires thick plastering (10–20mm per side)

  • WallPro requires only skim coating or none at all

  • ✅ Saved cement, materials, and skilled labor costs

3. Fewer Workers, Lower Payroll

Category

CHB Labor Cost

WallPro Labor Cost

Savings

Masons & Helpers

₱820,000

₱320,000

₱500,000+

Over ₱500,000 in labor cost savings

Completed wall stages 2 months ahead of schedule

Additional Financial Benefits

💡 Early Completion = Early Income

Finishing 2 months early allowed leasing to begin sooner, generating ₱200,000+ in rental revenue ahead of schedule.

🔒 Less Rework, Less Waste

Traditional CHB builds often require rework due to misalignment, cracks, or poor curing. WallPro’s precision panels eliminate these issues.

Energy Efficiency for Tenants

The building’s thermal insulated walls reduced electricity usage by up to 20%, increasing tenant satisfaction and occupancy rates.


Testimonials from the Project Team

“Switching to WallPro immediately reduced our manpower and accelerated our project timeline. The cost savings were undeniable.”Project Engineer, Uptown CDO
“As a developer, finishing early means faster returns. WallPro Panels helped us gain two extra months of profit.”Commercial Property Developer

Who Can Benefit from These Savings?

🧱 Contractors

✔ Reduce workforce requirements✔ Complete projects faster for higher turnover

🏢 Developers

✔ Boost ROI with earlier rental/sales revenue✔ Improve cash flow and investor confidence

🏡 Lot Owners

✔ Build cost-efficient homes✔ Minimize long-term maintenance costs


This case study proves one undeniable truth:

Sticking to CHB means losing time and money. WallPro is not just an alternative—it’s a financial advantage.

Whether you're a contractor, lot owner, or developer, switching to WallPro can transform your project economics and build timeline.

🚀 Save big. Build faster. Earn sooner. Choose WallPro.


📞 Message us now to request a FREE cost savings simulation for your project.

See how much you can save with WallPro—before your next build begins.


See How WallPro Panels Saved ₱500,000 in Labor Cost on a Single Commercial Project
See How WallPro Panels Saved ₱500,000 in Labor Cost on a Single Commercial Project

Comments


Wallpro System & Construction Inc | All Rights Reserved.
Cagayan de Oro
bottom of page