See How WallPro Panels Saved ₱500,000 in Labor Cost on a Single Commercial Project
- Gabriel Mikael
- Nov 6, 2025
- 2 min read
In construction, every peso counts—and every delay costs money. Traditional CHB construction requires heavy manpower, long curing times, and multiple steps that drive up labor expenses.
But a recent commercial project in Uptown Cagayan de Oro proved something game-changing:
By switching from CHB to WallPro Panels, the developer saved over ₱500,000 in labor costs—without sacrificing quality or safety.
This real-world case study reveals how WallPro is transforming Philippine construction economics.
The Project: A Commercial Building in Uptown CDO
Type: 4-storey commercial structure
Lot Size: 300 sqm
Original Plan: CHB wall system
Revised Plan: WallPro Panel System
🎯 Objective:
Reduce construction time and overall cost while meeting strict structural and aesthetic standards.
Where the Savings Came From
1. Faster Installation = Reduced Labor Days
CHB Method: 20 masons + 15 helpers over 90 days
WallPro Method: 8 installers + 4 helpers over 30 days
✅ 60 days saved in wall installation alone
2. Minimal Plastering Required
CHB requires thick plastering (10–20mm per side)
WallPro requires only skim coating or none at all
✅ Saved cement, materials, and skilled labor costs
3. Fewer Workers, Lower Payroll
Category | CHB Labor Cost | WallPro Labor Cost | Savings |
Masons & Helpers | ₱820,000 | ₱320,000 | ₱500,000+ |
✅ Over ₱500,000 in labor cost savings
✅ Completed wall stages 2 months ahead of schedule
Additional Financial Benefits
💡 Early Completion = Early Income
Finishing 2 months early allowed leasing to begin sooner, generating ₱200,000+ in rental revenue ahead of schedule.
🔒 Less Rework, Less Waste
Traditional CHB builds often require rework due to misalignment, cracks, or poor curing. WallPro’s precision panels eliminate these issues.
❄ Energy Efficiency for Tenants
The building’s thermal insulated walls reduced electricity usage by up to 20%, increasing tenant satisfaction and occupancy rates.
Testimonials from the Project Team
“Switching to WallPro immediately reduced our manpower and accelerated our project timeline. The cost savings were undeniable.”— Project Engineer, Uptown CDO
“As a developer, finishing early means faster returns. WallPro Panels helped us gain two extra months of profit.”— Commercial Property Developer
Who Can Benefit from These Savings?
🧱 Contractors
✔ Reduce workforce requirements✔ Complete projects faster for higher turnover
🏢 Developers
✔ Boost ROI with earlier rental/sales revenue✔ Improve cash flow and investor confidence
🏡 Lot Owners
✔ Build cost-efficient homes✔ Minimize long-term maintenance costs
This case study proves one undeniable truth:
Sticking to CHB means losing time and money. WallPro is not just an alternative—it’s a financial advantage.
Whether you're a contractor, lot owner, or developer, switching to WallPro can transform your project economics and build timeline.
🚀 Save big. Build faster. Earn sooner. Choose WallPro.
📞 Message us now to request a FREE cost savings simulation for your project.
See how much you can save with WallPro—before your next build begins.