What If Your Construction Project Could Finish 6 Months Earlier? Here’s How WallPro Makes It Possible

In construction, time is one of your most valuable assets. Every month of delay means additional expenses, extended labor costs, and lost income from rentals or sales. What if you could finish your construction project 6 months earlier than traditional CHB methods—without sacrificing strength, safety, or aesthetics?

With WallPro Panel Systems, that scenario is no longer wishful thinking—it’s a proven strategy used by top developers and contractors in Cagayan de Oro.

The Reality of Construction Delays

Traditional CHB construction involves multiple steps:

  • Masonry block laying

  • Curing time

  • Plastering and finishing

  • Redo work from cracks or misalignment

Each step takes time—and time costs money.

Unexpected weather can halt installation

Labor shortages can slow down productivity

Curing delays extend project timelines

WallPro eliminates these pain points.

How WallPro Cuts Construction Time by Up to 50%

WallPro Panels are pre-manufactured, ready-to-install panels that drastically speed up the wall-building process.

WallPro vs CHB Installation Speed

Construction Step

CHB Method

WallPro Panels

Wall Installation

30–60 days

10–20 days

Curing Period

14–28 days

Not required

Plastering

Required

Minimal or none

Total Duration

4–8 months

1–3 months

Skip plastering – WallPro already has a smooth finish

Reduced manpower – Easier and faster to install

Minimal curing – Finish walls and move to paint immediately

The result: Your entire project timeline can be shortened by up to 6 months.

Why Finishing Early = More Profit and Less Stress

For Developers

  • Generate sales or rental income earlier

  • Improve cash flow and reinvest faster

  • Beat competitors to market launch

For Contractors

  • Faster project turnover

  • Take on more projects within the year

  • Increase revenue and client satisfaction

For Lot Owners

  • Move into your home sooner

  • Save on renting temporary housing

  • Avoid price increases in materials over time

Stronger, Lighter, and Safer Than CHB

Time savings are only part of the story. WallPro also delivers 2x strength, better insulation, and disaster-ready performance.

🔷 Built for the Philippine Climate

  • Earthquake-resistant structural design

  • Fire-tested and certified

  • Thermal insulation that lowers electricity bills

You finish faster and build safer.


If you could shorten your construction timeline by 6 months, would you take that opportunity?With WallPro Panel Systems, you can.

Build faster.💪 Build stronger.📈 Earn sooner.

The construction industry is moving towards speed and innovation—and WallPro is leading that movement in Cagayan de Oro and beyond.


Don’t let traditional methods slow you down.

📞 Message us for a FREE consultation and project timeline estimate using WallPro.

🚀 Start building smarter, not harder.


What If Your Construction Project Could Finish 6 Months Earlier? Here’s How WallPro Makes It Possible
What If Your Construction Project Could Finish 6 Months Earlier? Here’s How WallPro Makes It Possible

Comments


Contact Us

Wallpro Systems & Const Inc

2F RPM Bldg. Golden Glow North Commercial Macapagal Rd., Upper Carmen Cagayan de Oro

9000, Philippines

+63917-5156755

© 2023 by Wallpro Systems & Construction Inc. All rights reserved.

Thanks for submitting!

bottom of page