top of page

1. Planning & Design

  •  Define your goals (luxury upgrade, space-saving, water-saving, etc.)

  •  Set a budget (include 10–20% buffer)

  •  Choose a bathroom layout (shower/tub placement, toilet, sink)

  •  Measure space accurately

  •  Gather inspiration (mood board, Pinterest, sample finishes)

  •  Decide on DIY vs. professional renovation

🧱 2. Demolition & Preparation

  •  Remove old tiles, fixtures, or cabinetry

  •  Inspect plumbing and electrical (upgrade if needed)

  •  Waterproofing: walls, floors, and corners

  •  Check and repair ventilation (install exhaust fan if needed)

🚽 3. Plumbing Fixtures

  •  Install/replace toilet (dual-flush or water-saving model)

  •  Install sink (pedestal, vanity, wall-mounted, etc.)

  •  Upgrade faucet (modern, touchless, or water-efficient)

  •  Install/upgrade shower or bathtub

  •  Add bidet or handheld sprayer (optional)

💡 4. Electrical & Lighting

  •  Add task lighting (vanity/mirror lights)

  •  Install ambient lighting (ceiling lights or downlights)

  •  Add power outlets (with GFCI protection)

  •  Install exhaust fan or improve air circulation

🪵 5. Surfaces & Finishes

  •  Wall tiles or waterproof panels

  •  Floor tiles (anti-slip, durable)

  •  Waterproof paint or finish (ceiling, drywall)

  •  Countertop (granite, quartz, or budget-friendly alternatives)

  •  Grouting and sealing (prevent moisture damage)

🚪 6. Storage & Accessories

  •  Vanity with drawers or cabinets

  •  Medicine cabinet or wall shelves

  •  Towel bars, rings, and robe hooks

  •  Mirror (framed, LED-lit, or fog-free)

  •  Shower caddy or niche

  •  Laundry hamper or organizer

🧼 7. Final Touches

  •  Shower curtain or glass enclosure

  •  Rugs and mats (non-slip)

  •  Soap dispensers, toothbrush holders, organizers

  •  Plants, artwork, or décor

  •  Deep clean entire bathroom

  •  Test all plumbing and electrical systems

BATHROOM UPGRADE CHECKLIST
BATHROOM UPGRADE CHECKLIST

 
 
 


1. Pre-Construction Planning

  •  Define your total budget (include contingency)

  •  Secure your lot / land title

  •  Conduct a soil test and topographic survey

  •  Decide on house type (bungalow, 2-storey, duplex, etc.)

  •  Draft initial house layout or hire an architect

  •  Create a list of needs vs. wants (bedrooms, bathrooms, storage, etc.)

🏗️ 2. Permits and Paperwork

  •  Secure Barangay Clearance

  •  Get Zoning & Building Permits

  •  Apply for Electrical and Plumbing Permits

  •  Submit building plans for approval

  •  Secure a Construction Safety and Health Program (CSHP), if required

🔨 3. Choosing Your Team

  •  Hire a licensed architect and/or civil engineer

  •  Hire a reputable contractor or builder

  •  Sign a written construction contract with clear scope, costs, and timelines

  •  Set regular site meetings with your builder/team

🧱 4. Site Preparation & Foundation

  •  Clear and level the lot

  •  Set out the foundation and layout

  •  Pour concrete for footings and columns

  •  Install plumbing and electrical pipes beneath slab

🧰 5. Structural and Framing

  •  Erect columns, beams, and walls (CHB, AAC, or panels like WallPro)

  •  Construct roofing structure (trusses, sheathing)

  •  Install roofing material (GI sheets, metal roof, tiles)

🚪 6. Utilities & Interior Work

  •  Rough-in plumbing, electrical, and HVAC (if any)

  •  Install doors and windows

  •  Ceiling, partitions, and insulation (if needed)

  •  Flooring installation (tiles, wood, vinyl, etc.)

  •  Interior wall finishes and painting

🪴 7. Exterior Finishing

  •  Paint exterior walls

  •  Install gutters and downspouts

  •  Build perimeter fence or gate (optional)

  •  Landscape or level yard

🪑 8. Final Touches

  •  Install light fixtures, switches, outlets

  •  Finalize kitchen and bathroom fittings (cabinets, sinks, toilets)

  •  Deep clean the house before move-in

  •  Conduct final inspection and punch listing

📦 9. Move-In and Post-Construction

  •  Apply for water and electrical connection

  •  Request final occupancy permit

  •  Move in your furniture and appliances

  •  Keep all receipts, warranties, and project documents

  •  Schedule periodic maintenance and inspection

BASIC HOME BUILDING CHECKLIST
BASIC HOME BUILDING CHECKLIST

 
 
 


Already own a lot in Cagayan de Oro?

You’re halfway to your dream home! 🏡


With WallPro Systems & Construction, we offer full house construction starting at ₱2.5M all-in—perfect for 2–3 bedroom homes built with durability, speed, and value in mind.

Our #WallProPanelSystem allows for faster build times, better insulation, and long-term savings—ideal for CDO’s climate and your family's comfort.


✅ What’s Included in the ₱2.5M+ Package?

  • 🧱 Structural system using WallPro panels

  • ✍️ Full architectural & engineering design

  • 👷 Skilled labor + quality materials

  • 🛁 Basic finishes: bathroom, kitchen, flooring

  • 🪟 Doors, windows, electrical, plumbing

  • 🗂️ Permit processing support


💬 Flexible Financing? Yes!

  • Pag-IBIG or Bank Loan? We help process.

  • Already approved? We’ll build to match your budget.

  • Not sure yet? Get free monthly amortization simulation.


📩 Message us today to see actual plans and sample computations.

Your lot is waiting. Let’s build your future on it. 🏡


Lot Already Ready? Let’s Start Building Today!
Lot Already Ready? Let’s Start Building Today!

 
 
 

Contact Us

Wallpro Systems & Const Inc

2F RPM Bldg. Golden Glow North Commercial Macapagal Rd., Upper Carmen Cagayan de Oro

9000, Philippines

+63917-5156755

© 2023 by Wallpro Systems & Construction Inc. All rights reserved.

Thanks for submitting!

bottom of page