top of page


The Cheapest Construction Quote May Be Missing the Most Important Work
The Cheapest Construction Quote May Be Missing the Most Important Work You receive three quotations for the same proposed house. Contractor A: ₱2.5 millionContractor B: ₱2.9 millionContractor C: ₱3.2 million At first glance, the decision seems obvious. Why would you pay ₱3.2 million when somebody is willing to build the house for ₱2.5 million? But before signing with the lowest bidder, ask one important question: Are all three contractors actually quoting the same project? A
Gabriel Mikael
Aug 2710 min read


The Cheapest Construction Quote Can Become the Most Expensive
When planning to build a house, it is natural to look for the lowest possible construction price. A homeowner may receive three quotations: Contractor A: ₱3.5 million Contractor B: ₱3.2 million Contractor C: ₱2.7 million At first glance, Contractor C appears to offer the best deal. Choosing the lowest quotation may seem like an immediate saving of ₱500,000 to ₱800,000. But what happens when the cheapest proposal excludes permits, cabinets, fixtures, drainage, utility connecti
Gabriel Mikael
Aug 812 min read


Why Per-Square-Meter Pricing Can Mislead CDO Lot Owners
When planning to build a house in Cagayan de Oro, one of the first questions many lot owners ask is: “How much is your construction cost per square meter?” It is an understandable question. Multiplying the proposed floor area by a contractor’s advertised rate appears to provide a fast and convenient construction estimate. For example, if a contractor quotes ₱30,000 per square meter for a 100-square-meter house, the expected construction cost may appear to be: 100 sqm × ₱30,00
Gabriel Mikael
Aug 312 min read
bottom of page


