Checklist: “Am I Ready to Build?” Self-Assessment for Lot Owners

Before you pour the first bag of cement, make sure you’re really ready.

Building your dream home isn’t just about saving money — it’s about timing, readiness, and planning.Many lot owners jump too early and end up stuck midway due to permits, budget, or poor coordination.Use this quick self-check to know if you’re truly ready to build smart.

📋 Step 1: Land & Legal Readiness

Question

Notes

Do you have a clean Transfer Certificate of Title (TCT)?

Must match Tax Declaration and survey.

Is your lot boundary verified by a licensed Geodetic Engineer?

Prevent encroachment or re-survey issues.

Are real property taxes fully updated and paid?

Required before permit filing.

🟢 Tip: Scan all land docs and keep digital copies for permits and financing.


💰 Step 2: Budget Readiness

Question

Notes

Have you set your target build cost (₱1M / ₱1.5M / ₱2M)?

Include 10% contingency.

Do you have cash + financing strategy ready (Pag-IBIG, bank, or phased)?

Combine funds smartly.

Have you requested at least two quotations from contractors?

Compare scope and inclusions.

🟢 Tip: Prioritize value engineering — not just the lowest price.


🧱 Step 3: Design & Technical Readiness

Question

Notes

Do you have a final layout approved by an architect or engineer?

Needed for permits.

Is your walling system decided (CHB vs. WallPro)?

Impacts timeline and cost.

Are foundation and structure sized for future expansion?

Avoid rework later.

🟢 Tip: WallPro Panels let you build in phases, saving time and budget.


🧾 Step 4: Permit & Regulatory Readiness

Question

Notes

Have you secured your Barangay & Zoning clearances?

First step before Building Permit.

Are architectural, structural, and MEP plans signed and sealed?

Required for Building Permit.

Do you have your Fire Safety & Electrical Permits ready for filing?

Speeds up inspection later.

🟢 Tip: File all permits together — processing is faster when plans are complete.


🧰 Step 5: Timeline & Commitment Check

Question

Notes

Do you have a timeline tracker for weekly progress?

Prevents idle days and cost creep.

Have you chosen a contractor with clear milestones?

Pay per completed phase.

Are you ready to supervise or assign a trusted project monitor?

Communication is key.

🟢 Tip: Keep a weekly photo log for accountability and documentation.


Your Score:

  • 13–15 checks: ✅ You’re construction-ready! Contact WallPro and start your build plan.

  • 8–12 checks: ⚙️ Almost ready! Just finalize docs or budget before signing contracts.

  • Below 8: 🧩 Pause and plan. Join our free orientation for lot owners.


💡 Next Step: Build Smart, Not in Stress

A great home starts with great preparation.

👉 DM “READY” to get your Free Starter Kit + Readiness Planner from WallPro Systems & Construction Inc.

Includes:

📋 Self-Assessment

📊 Timeline Tracker

🏗️ ₱1M Cost Plan

✅ Permit Checklist


 Take this 5-step self-assessment to see if you’re truly ready to start building your home. Includes budget, permits, and design readiness — by WallPro Systems.


Comments


Contact Us

Wallpro Systems & Const Inc

2F RPM Bldg. Golden Glow North Commercial Macapagal Rd., Upper Carmen Cagayan de Oro

9000, Philippines

+63917-5156755

© 2023 by Wallpro Systems & Construction Inc. All rights reserved.

Thanks for submitting!

bottom of page