top of page


See How WallPro Panels Saved ₱500,000 in Labor Cost on a Single Commercial Project
In construction, every peso counts—and every delay costs money. Traditional CHB construction requires heavy manpower, long curing times, and multiple steps that drive up labor expenses. But a recent commercial project in Uptown Cagayan de Oro  proved something game-changing: By switching from CHB to WallPro Panels, the developer saved over ₱500,000 in labor costs—without sacrificing quality or safety. This real-world case study reveals how WallPro is transforming Philippine c
Gabriel Mikael
13h2 min read
Â
Â
Â
bottom of page