top of page


What’s Included and Excluded in Your Quotation or Cost per Sqm? (The Checklist That Prevents Budget Blowouts)
Cost per sqm” is only useful if you know exactly what’s inside the price . Two builders can quote the same ₱/sqm and deliver completely different outputs because of allowances, exclusions, and vague scopes . A reliable quotation must include: Scope per trade (what work is covered) Material/brand/specs (or clear allowances) Quantities/BOQ (or a detailed breakdown) Inclusions + exclusions list (written, not verbal) Siteworks + permits + utilities clarity Why Cost per Sqm Mi
Gabriel Mikael
1 day ago3 min read


Hidden Costs People Don’t Expect When Building a House (Siteworks, Permits, Utilities, and More)
Most “budget blowouts” happen because the quote covers structure + finishes , but the real-world costs live in siteworks, approvals, connections, and exclusions . Here’s the hidden-cost checklist lot owners should budget for before signing. The 7 Hidden Cost Buckets Plan for these on top of your main construction cost: Siteworks & Ground Conditions Permits, professional fees, and compliance Utilities & connections (power/water/internet/drainage) External works (fence, gate, d
Gabriel Mikael
2 days ago3 min read
bottom of page