What’s Included and Excluded in Your Quotation or Cost per Sqm? (The Checklist That Prevents Budget Blowouts)

Cost per sqm” is only useful if you know exactly what’s inside the price. Two builders can quote the same ₱/sqm and deliver completely different outputs because of allowances, exclusions, and vague scopes.


A reliable quotation must include:

  • Scope per trade (what work is covered)

  • Material/brand/specs (or clear allowances)

  • Quantities/BOQ (or a detailed breakdown)

  • Inclusions + exclusions list (written, not verbal)

  • Siteworks + permits + utilities clarity


Why Cost per Sqm Misleads Lot Owners

Cost per sqm becomes dangerous when:

  • the quote says “included” but no specs

  • finishes are “allowance only” (too low)

  • siteworks/hauling are capped with small limits

  • utilities are assumed “by owner”

  • the design is not final (sqm changes later)

Rule: If it’s not written, it’s not included.


What’s Usually INCLUDED (If It’s a True Turnover Build)

Use this as your baseline checklist.

1) Preliminaries

  • mobilization, temporary facilities (sometimes)

  • site supervision (engineer/foreman)

  • safety and protection works (basic)

2) Structural + Shell

  • excavation (with stated scope), footings, columns, beams, slab

  • walls (CHB or panel system), plastering/rendering (if included)

  • roof framing + roof cover + gutters (specs matter)

  • exterior paint system (primer/topcoat spec)

3) Architectural Finishes

  • floor tiles (with tile size + brand/allowance)

  • ceiling system (type + height + design complexity)

  • interior paint

  • doors/windows (materials + thickness + hardware)

  • stairs (if 2-storey)

4) MEPF (Mechanical/Electrical/Plumbing)

  • plumbing rough-in + fixtures (with allowance/spec)

  • electrical rough-in + panelboard + outlets/switches (count matters)

  • lighting points (often included, fixtures often NOT)

5) Standard Turnover Testing

  • basic testing/commissioning (limited)

  • punchlist rectification (within scope)


What’s Commonly EXCLUDED (The “Hidden” Budget Killers)

Even good builders exclude these unless explicitly included:

A) Siteworks beyond a basic allowance

  • excess excavation, extra hauling/trucking

  • retaining walls (sloped lots)

  • major drainage works / soak away systems

  • poor soil solutions (extra footing depth, more rebar)

B) Permits + professional fees

  • signed/sealed plans, design fees (sometimes separate)

  • building permit fees, processing, revisions

C) Utilities & connections

  • electric meter/service application, transformer upgrades (if needed)

  • water meter connection, tank + booster pump

  • septic upgrades, leach field extensions

  • internet conduit beyond basic

D) External works

  • perimeter fence, gate, driveway upgrades

  • landscaping, exterior lighting, CCTV

  • kitchen cabinetry and wardrobes (often excluded or allowance only)

E) Owner-supplied items

  • appliances, specialty lighting fixtures, premium sanitary fixtures

  • smart home systems, solar, water heater systems


The 12 Questions You Must Ask Before You Sign

  1. Is this quote construction-only or full turnover?

  2. Do you have a written inclusions/exclusions list?

  3. What are the allowances for tiles, doors, windows, fixtures, cabinets?

  4. How many outlets, switches, lighting points are included?

  5. Roof spec: what thickness/type of steel, insulation, gutter scope?

  6. Paint system: how many coats, what brand/class?

  7. Waterproofing: where exactly is it applied (T&B, balconies)?

  8. Siteworks: what’s the hauling allowance (truckloads/m³)?

  9. Are permits included? If yes, what exactly (fees + processing + sign/seal)?

  10. Utilities: what’s included for water tank, pump, meter base, grounding?

  11. What’s the change order (VO) process and markup?

  12. Is there a BOQ or detailed breakdown I can review?


Red Flags (Walk Away or Rewrite the Contract)

  • “All-in” but no inclusions list

  • “Standard finishes” without specs

  • allowances with no amounts

  • no VO/change order rules

  • lump-sum quote with no BOQ or breakdown


Best Practice: Demand a 1-Page Inclusions/Exclusions Matrix

Ask your builder to provide a simple legend:

  • ✅ Included

  • ⚠️ Included with allowance (state ₱ amount)

  • ❌ Excluded (owner pays)

  • ◻️ Optional add-on (priced)

That one page prevents 80% of disputes.


What’s Included and Excluded in Your Quotation or Cost per Sqm? (The Checklist That Prevents Budget Blowouts)
What’s Included and Excluded in Your Quotation or Cost per Sqm? (The Checklist That Prevents Budget Blowouts)

Comments


Contact Us

Wallpro Systems & Const Inc

2F RPM Bldg. Golden Glow North Commercial Macapagal Rd., Upper Carmen Cagayan de Oro

9000, Philippines

+63917-5156755

OPENING HOURS

Mon - Fri: 8:00 AM - 5:00 PM

Sat: 8:00 AM - 12:00 PM

© 2023 by Wallpro Systems & Construction Inc. All rights reserved.

Thanks for submitting!

bottom of page