2026 CDO cost ranges (construction only, ₱/sqm)
Tier What it really means 2026 CDO planning range (₱/sqm) BARE “Shell” / rough-in ready (not livable finish) ₱21,000 – ₱26,000 (planning) BASIC Livable, simple finishes ₱26,000 – ₱30,000 STANDARD Mid-level finishes + better fixture set ₱30,000 – ₱36,000 PREMIUM Higher-end finishes/details ₱36,000 – ₱45,000+ Legend: ✅ Included ⚠️ Allowance/limited ❌ Excluded (add-on / owner-supplied) 1) STRUCTURE + SHELL (major scope) Item BARE BASIC STANDARD PREMIUM Mobilization, t