From Lot to Move-In” Step-by-Step


You Own a Lot. Why Are You Still Not Building? Here’s the Step-by-Step Plan


You’re not “lazy.” You’re stuck because home building feels like 1,000 decisions with expensive consequences. The fix isn’t motivation. It’s a simple sequence.


Step 1: Define the build target (1 day).

Lock your floor area and must-haves. Bigger later is easier than “bigger mid-build.” Write two lists: Must-have and Nice-to-have.

Step 2: Align budget with reality (2–3 days).

Do a basic BOQ by phase. Confirm inclusions/exclusions (permits, hauling, temporary power/water, septic, gate). Add 8–12% contingency.

Step 3: Choose the right builder (3–7 days).

See similar completed projects. Ask for timeline, manpower plan, QC process, and who manages your site daily.

Step 4: Sign a contract that protects you (1–2 days)

Scope, timeline, payment milestones, variation order process, warranty, punchlist, and retention/holdback (if applicable).

Step 5: Permits and pre-start readiness (1–4 weeks).

Confirm responsibilities: who processes, who pays, what documents are needed. Prepare site access and storage.

Step 6: Build by phases (8–16+ weeks typical).

Foundation → structure → roof → walls → MEP rough-in → finishes → external works.

Step 7: Weekly QC (30–45 mins/week).

Photos, checklist, and “what gets covered next” inspection. This is how you avoid rework.

Step 8: Turnover and punchlist (final week).

Water test, electrical test, plumbing test, doors/windows alignment. Clear defects before final payment.

Want a simple printable checklist you can bring to site? DM “STARTER PACK.”Hashtags: #HomeBuilding #FirstTimeBuilder #BudgetBuild #LotOwner #ConstructionChecklist


2) Checklist PDF (lead magnet)


Quick mini-checklist:

  •  Lock floor area + must-haves

  •  BOQ by phase + inclusions/exclusions

  •  Contract with milestones + VO process

  •  Permit path confirmed

  •  Weekly site QC routine

  •  Punchlist before final payment


You have a lot. What’s stopping you?

The real reason: too many decisions, no sequence

  1. Step 1: Lock floor area + must-haves

  2. Step 2: BOQ by phase (even basic)

  3. Step 3: Choose builder (projects + schedule + QC)

  4. Step 4: Contract that controls changes

  5. Step 5: Permits + site readiness

  6. Step 6: Build phases (foundation to finishes)

  7. Step 7: Weekly QC prevents rework


    Want the printable checklist? DM STARTER PACK and I’ll send the printable checklist.

From Lot to Move-In” Step-by-Step
From Lot to Move-In” Step-by-Step


Comments

Couldn’t Load Comments
It looks like there was a technical problem. Try reconnecting or refreshing the page.

Contact Us

Wallpro Systems & Const Inc

2F RPM Bldg. Golden Glow North Commercial Macapagal Rd., Upper Carmen Cagayan de Oro

9000, Philippines

+63917-5156755

OPENING HOURS

Mon - Fri: 8:00 AM - 5:00 PM

Sat: 8:00 AM - 12:00 PM

© 2023 by Wallpro Systems & Construction Inc. All rights reserved.

Thanks for submitting!

bottom of page