From Lot to Move-In” Step-by-Step
- Gabriel Mikael
- 1 day ago
- 2 min read
You Own a Lot. Why Are You Still Not Building? Here’s the Step-by-Step Plan
You’re not “lazy.” You’re stuck because home building feels like 1,000 decisions with expensive consequences. The fix isn’t motivation. It’s a simple sequence.
Step 1: Define the build target (1 day).
Lock your floor area and must-haves. Bigger later is easier than “bigger mid-build.” Write two lists: Must-have and Nice-to-have.
Step 2: Align budget with reality (2–3 days).
Do a basic BOQ by phase. Confirm inclusions/exclusions (permits, hauling, temporary power/water, septic, gate). Add 8–12% contingency.
Step 3: Choose the right builder (3–7 days).
See similar completed projects. Ask for timeline, manpower plan, QC process, and who manages your site daily.
Step 4: Sign a contract that protects you (1–2 days)
Scope, timeline, payment milestones, variation order process, warranty, punchlist, and retention/holdback (if applicable).
Step 5: Permits and pre-start readiness (1–4 weeks).
Confirm responsibilities: who processes, who pays, what documents are needed. Prepare site access and storage.
Step 6: Build by phases (8–16+ weeks typical).
Foundation → structure → roof → walls → MEP rough-in → finishes → external works.
Step 7: Weekly QC (30–45 mins/week).
Photos, checklist, and “what gets covered next” inspection. This is how you avoid rework.
Step 8: Turnover and punchlist (final week).
Water test, electrical test, plumbing test, doors/windows alignment. Clear defects before final payment.
Want a simple printable checklist you can bring to site? DM “STARTER PACK.”Hashtags: #HomeBuilding #FirstTimeBuilder #BudgetBuild #LotOwner #ConstructionChecklist
2) Checklist PDF (lead magnet)
Quick mini-checklist:
Lock floor area + must-haves
BOQ by phase + inclusions/exclusions
Contract with milestones + VO process
Permit path confirmed
Weekly site QC routine
Punchlist before final payment
You have a lot. What’s stopping you?
The real reason: too many decisions, no sequence
Step 1: Lock floor area + must-haves
Step 2: BOQ by phase (even basic)
Step 3: Choose builder (projects + schedule + QC)
Step 4: Contract that controls changes
Step 5: Permits + site readiness
Step 6: Build phases (foundation to finishes)
Step 7: Weekly QC prevents rework
Want the printable checklist? DM STARTER PACK and I’ll send the printable checklist.