top of page


What Causes House Construction Delays Most Often—and How Do You Prevent Them?
Most delays come from just 7 repeatable causes . A good builder prevents them with front-loaded planning, locked decisions, tight procurement, and weekly controls . Top causes of delays: design changes, permit bottlenecks, late finish decisions, material lead times, site surprises, weather/curing time, and payment/procurement gaps. Prevention: freeze scope early, complete requirements before filing, set decision deadlines, pre-order long-lead items, verify site conditions,
Gabriel Mikael
Jan 263 min read


Exact Phases of House Construction (Start to Finish)
Here’s the real, step-by-step construction flow most professional builders follow—plus what you should expect to see at each phase. Phase 0: Pre-Construction Setup Goal: Make sure the build is “ready to start” with zero guesswork. Final plans (signed/sealed if required) Final BOQ + specifications Contract + payment milestones Construction schedule (target dates) Site mobilization plan (temporary power/water, storage, safety) Owner checkpoint: Layout + floor area + finish l
Gabriel Mikael
Jan 252 min read


How Long Will the Whole Project Take From Design to Turnover?
Most residential builds (lot owners) typically take 4 to 9 months from design start to turnover , depending on permit readiness, house size, storeys, and finish level. Fast-track (simple design + complete documents + flat lot): ~4–6 months Typical (custom design + normal approvals + standard finishes): ~6–9 months Complex (2-storey, many upgrades, siteworks/retaining, frequent changes): ~9–12+ months The Real Timeline Breakdown (End-to-End) Phase 1: Planning + Design (
Gabriel Mikael
Jan 242 min read


Do You Provide a Detailed BOQ and Specifications?
Yes—any serious build should come with a detailed BOQ (Bill of Quantities) and written specifications. That’s the only way you can compare quotes fairly, control your budget, and avoid “assumed” items that become surprise charges later. A detailed BOQ lists the materials, quantities, and scope of work per trade. Specifications define the exact quality level (brands, thickness, mix ratios, installation standards, allowances).Together, they make the quote transparent and enfor
Gabriel Mikael
Jan 232 min read


What’s Included and Excluded in Your Quotation or Cost per Sqm? (The Checklist That Prevents Budget Blowouts)
Cost per sqm” is only useful if you know exactly what’s inside the price . Two builders can quote the same ₱/sqm and deliver completely different outputs because of allowances, exclusions, and vague scopes . A reliable quotation must include: Scope per trade (what work is covered) Material/brand/specs (or clear allowances) Quantities/BOQ (or a detailed breakdown) Inclusions + exclusions list (written, not verbal) Siteworks + permits + utilities clarity Why Cost per Sqm Mi
Gabriel Mikael
Jan 223 min read


Hidden Costs People Don’t Expect When Building a House (Siteworks, Permits, Utilities, and More)
Most “budget blowouts” happen because the quote covers structure + finishes , but the real-world costs live in siteworks, approvals, connections, and exclusions . Here’s the hidden-cost checklist lot owners should budget for before signing. The 7 Hidden Cost Buckets Plan for these on top of your main construction cost: Siteworks & Ground Conditions Permits, professional fees, and compliance Utilities & connections (power/water/internet/drainage) External works (fence, gate, d
Gabriel Mikael
Jan 213 min read


Do You Offer Custom Design, or Do You Use Standard Templates?
We can do both. The best option depends on your lot shape, budget, timeline, and lifestyle needs . Custom design = built around your lot + priorities (best fit, best long-term value). Standard template = faster, lower design cost, predictable layout (best for simple lots + tight timelines). Hybrid (recommended for most lot owners) = start from a proven template, then customize key parts to match your lot and lifestyle. Option 1: Full Custom Design Choose custom if: Your
Gabriel Mikael
Jan 202 min read


What House Design/Layout Fits My Family’s Lifestyle Best? (Practical Guide for Lot Owners)
The best house layout is the one that matches your daily routine (work/school/sleep), your privacy needs , and your future plans (kids, aging parents, home office). Stop choosing layouts by “looks”—choose by how you live . Choose Your Layout Based on Your Family Type 1) If you’re a “Busy Weekday Family” (school + work + errands) Best layout: Open living/dining/kitchen + mudroom + laundry zone Fast morning flow (kitchen → dining → out the door) Storage near entry (bags, s
Gabriel Mikael
Jan 192 min read


WallPro vs CHB: what changes in labor, speed, waste
If you’re choosing between WallPro panels and traditional CHB (concrete hollow blocks) , don’t start with “Which is cheaper per sqm?” Start with this better question: Which system reduces labor hours, shortens the schedule, and cuts site waste—without sacrificing strength and finish quality? Because in real residential builds, the biggest budget leaks come from three things: Slow progress (extended overhead + longer labor exposure) Labor-heavy processes (more workers, more
Gabriel Mikael
Jan 163 min read


Site visit checklist: what we check before quoting
A proper site visit before quoting checks legal readiness, site conditions, access/logistics, utilities, drainage/topography, and risk items (siteworks/soil) so the quote includes real-world costs—not assumptions. Pre-construction assessments commonly cover legal compliance, geotechnical conditions, environmental factors, and hazards because they prevent “surprise” costs later. Why a site visit matters (the real reason budgets blow up) Most budget blowouts happen because quo
Gabriel Mikael
Jan 153 min read


Milestone payments: how homeowners stay in control
If you’re building a house and you want less stress, fewer surprises, and tighter budget control , your payment system matters as much as your design. The simplest rule that protects homeowners is this: Pay for verified progress—not promises. That’s what milestone payments do: they release money only after a defined stage of work is completed and confirmed , rather than paying a huge amount upfront or paying loosely “as needed.” A progress payment is commonly defined as a par
Gabriel Mikael
Jan 143 min read


3 hidden exclusions that cause budget blowouts
If you’ve ever wondered why a “cheap” quote suddenly becomes expensive halfway through the build, it’s usually not magic—it’s exclusions . These are items that are not included in the contract price (or are included only as small “allowances”), so the homeowner ends up paying extra later. Here are the 3 most common hidden exclusions that cause budget blowouts—and how to protect yourself. Hidden Exclusion #1: Permits, professional documents, and occupancy requirements Why it
Gabriel Mikael
Jan 133 min read


Real cost of a 60sqm home in CDO (3 tiers)
How much is a 60sqm build in Cagayan de Oro? If you’re budgeting a 60sqm house in CDO, a practical way to estimate is cost per square meter × 60sqm . Based on common finish levels used by CDO builders, here are realistic planning ranges: Finish tier (3 tiers) Typical cost per sqm Estimated total for 60sqm Basic finish ₱25,000–₱28,000 / sqm ₱1,500,000–₱1,680,000 Mid-level finish ₱29,000–₱33,000 / sqm ₱1,740,000–₱1,980,000 High-end finish ₱34,000–₱40,000+ / sqm ₱2,040,000–₱2,40
Gabriel Mikael
Jan 123 min read
bottom of page


