What Causes House Construction Delays Most Often—and How Do You Prevent Them?
Most delays come from just 7 repeatable causes . A good builder prevents them with front-loaded planning, locked decisions, tight procurement, and weekly controls . Top causes of delays: design changes, permit bottlenecks, late finish decisions, material lead times, site surprises, weather/curing time, and payment/procurement gaps. Prevention: freeze scope early, complete requirements before filing, set decision deadlines, pre-order long-lead items, verify site conditions,
Gabriel Mikael
Jan 263 min read


Exact Phases of House Construction (Start to Finish)
Here’s the real, step-by-step construction flow most professional builders follow—plus what you should expect to see at each phase. Phase 0: Pre-Construction Setup Goal: Make sure the build is “ready to start” with zero guesswork. Final plans (signed/sealed if required) Final BOQ + specifications Contract + payment milestones Construction schedule (target dates) Site mobilization plan (temporary power/water, storage, safety) Owner checkpoint: Layout + floor area + finish l
Gabriel Mikael
Jan 252 min read


How Long Will the Whole Project Take From Design to Turnover?
Most residential builds (lot owners) typically take 4 to 9 months from design start to turnover , depending on permit readiness, house size, storeys, and finish level. Fast-track (simple design + complete documents + flat lot): ~4–6 months Typical (custom design + normal approvals + standard finishes): ~6–9 months Complex (2-storey, many upgrades, siteworks/retaining, frequent changes): ~9–12+ months The Real Timeline Breakdown (End-to-End) Phase 1: Planning + Design (
Gabriel Mikael
Jan 242 min read


Do You Provide a Detailed BOQ and Specifications?
Yes—any serious build should come with a detailed BOQ (Bill of Quantities) and written specifications. That’s the only way you can compare quotes fairly, control your budget, and avoid “assumed” items that become surprise charges later. A detailed BOQ lists the materials, quantities, and scope of work per trade. Specifications define the exact quality level (brands, thickness, mix ratios, installation standards, allowances).Together, they make the quote transparent and enfor
Gabriel Mikael
Jan 232 min read


What’s Included and Excluded in Your Quotation or Cost per Sqm? (The Checklist That Prevents Budget Blowouts)
Cost per sqm” is only useful if you know exactly what’s inside the price . Two builders can quote the same ₱/sqm and deliver completely different outputs because of allowances, exclusions, and vague scopes . A reliable quotation must include: Scope per trade (what work is covered) Material/brand/specs (or clear allowances) Quantities/BOQ (or a detailed breakdown) Inclusions + exclusions list (written, not verbal) Siteworks + permits + utilities clarity Why Cost per Sqm Mi
Gabriel Mikael
Jan 223 min read


Hidden Costs People Don’t Expect When Building a House (Siteworks, Permits, Utilities, and More)
Most “budget blowouts” happen because the quote covers structure + finishes , but the real-world costs live in siteworks, approvals, connections, and exclusions . Here’s the hidden-cost checklist lot owners should budget for before signing. The 7 Hidden Cost Buckets Plan for these on top of your main construction cost: Siteworks & Ground Conditions Permits, professional fees, and compliance Utilities & connections (power/water/internet/drainage) External works (fence, gate, d
Gabriel Mikael
Jan 213 min read


Site visit checklist: what we check before quoting
A proper site visit before quoting checks legal readiness, site conditions, access/logistics, utilities, drainage/topography, and risk items (siteworks/soil) so the quote includes real-world costs—not assumptions. Pre-construction assessments commonly cover legal compliance, geotechnical conditions, environmental factors, and hazards because they prevent “surprise” costs later. Why a site visit matters (the real reason budgets blow up) Most budget blowouts happen because quo
Gabriel Mikael
Jan 153 min read


3 hidden exclusions that cause budget blowouts
If you’ve ever wondered why a “cheap” quote suddenly becomes expensive halfway through the build, it’s usually not magic—it’s exclusions . These are items that are not included in the contract price (or are included only as small “allowances”), so the homeowner ends up paying extra later. Here are the 3 most common hidden exclusions that cause budget blowouts—and how to protect yourself. Hidden Exclusion #1: Permits, professional documents, and occupancy requirements Why it
Gabriel Mikael
Jan 133 min read


Real cost of a 60sqm home in CDO (3 tiers)
How much is a 60sqm build in Cagayan de Oro? If you’re budgeting a 60sqm house in CDO, a practical way to estimate is cost per square meter × 60sqm . Based on common finish levels used by CDO builders, here are realistic planning ranges: Finish tier (3 tiers) Typical cost per sqm Estimated total for 60sqm Basic finish ₱25,000–₱28,000 / sqm ₱1,500,000–₱1,680,000 Mid-level finish ₱29,000–₱33,000 / sqm ₱1,740,000–₱1,980,000 High-end finish ₱34,000–₱40,000+ / sqm ₱2,040,000–₱2,40
Gabriel Mikael
Jan 123 min read


You Own a Lot in Cagayan de Oro—So Why Is Your House Still “Next Month”? Use the Budget Lock System to Start Without Fear
If you already own a lot in Cagayan de Oro, you should feel excited. But most lot owners feel the opposite: stuck, hesitant, and overwhelmed. One month becomes one year. The dream house stays in your head because one question keeps repeating: “What if I start… and the cost explodes?” That fear is valid. Construction is one of the biggest financial decisions you’ll ever make. The good news: you don’t need blind confidence. You need a system that protects you before the first h
Gabriel Mikael
Jan 53 min read


Can I Build a House with a ₱1M Budget in Cagayan de Oro?
A Realistic Guide on How to Make It Happen 🔍 What Can You Expect from a ₱1M House Budget? Your ₱1 million budget won’t build a mansion,...
Gabriel Mikael
Apr 23, 20252 min read