How much will it cost all-in to build a house?

If you only budget for “construction,” you’re setting yourself up for the most painful surprise: the real bill shows up in the extras—permits, siteworks, utility connections, and furniture you need just to live.

Here’s the all-in cost formula smart homeowners use:


All-In = Construction + Permits/Design Fees + Siteworks + Utilities + Furniture/Appliances + Contingency

What usually gets missed:

  • Permits & professional plans (processing + signed/sealed requirements)

  • Siteworks (excavation, backfill, drainage, hauling—this can swing big)

  • Utilities (power/water connection, rough-ins, upgrades, internet conduits)

  • Furniture & essentials (beds, cabinets, curtains, lighting fixtures, appliances)


The solution: stop guessing. Lock floor area + finish tier, then request a BOQ with written inclusions/exclusions. Add a 10–15% contingency so “unexpected” doesn’t break you.


Want a copy-paste All-In Budget Checklist (with line items + allowances)?

Comment/DM “ALL-IN” and I’ll send it.



How much will it cost all-in to build a house?
How much will it cost all-in to build a house?

Comments


Contact Us

Wallpro Systems & Const Inc

2F RPM Bldg. Golden Glow North Commercial Macapagal Rd., Upper Carmen Cagayan de Oro

9000, Philippines

+63917-5156755

OPENING HOURS

Mon - Fri: 8:00 AM - 5:00 PM

Sat: 8:00 AM - 12:00 PM

© 2023 by Wallpro Systems & Construction Inc. All rights reserved.

Thanks for submitting!

bottom of page