What If You Build a “Phase 1 House” First—Not Your Full Dream House Yet?

What if the reason you’re still not building isn’t money… but the idea that you must finish everything before you can start?


A lot of CDO lot owners delay for years waiting for a “complete budget.” Meanwhile, prices rise, rent continues, and the dream keeps moving farther. The smarter move is Phase 1: build the livable core now—upgrade later.


What a Phase 1 House Really Means (Simple + Livable)

Phase 1 is the minimum complete home you can live in comfortably:

  • strong foundation + structure

  • roof completed (weather-tight)

  • basic electrical + plumbing

  • 1 toilet & bath

  • 1 bedroom

  • simple kitchen area

  • basic flooring (optional, depends on budget)

Then Phase 2 and Phase 3 are upgrades—when cash flow is ready.


Why Phased Building Works (Especially in CDO)

1) You stop bleeding money on rent

Even a simple livable home beats paying rent while “waiting.”

2) You control budget better

You lock the expensive parts first (structure + roof + utilities) and delay cosmetic upgrades.

3) You reduce stress and decision overload

You focus only on what’s needed now, not every finish and feature.


The Rules to Avoid the “Unfinished Look”

Phased doesn’t mean ugly. It means planned.

Realistic solutions:

  • Use a clean, simple façade (straight lines, fewer corners)

  • Choose a roof design that looks finished even with basic walls

  • Plan future room expansions in the layout (no awkward add-ons later)

  • Reserve electrical/plumbing provisions now to avoid hacking walls later


The 5 Things You Must Lock Before Starting Phase 1

  1. target floor area (Phase 1 size)

  2. layout (rooms now vs later)

  3. roof type (simple saves money)

  4. finish level (bare/core vs basic)

  5. expansion plan (where Phase 2 will go)

This prevents costly change orders—the #1 budget killer.


Comment or DM PHASED and I’ll send a Phase 1 House checklist (what to build now, what to delay, and how to prepare for Phase 2 without rework).


What If You Build a “Phase 1 House” First—Not Your Full Dream House Yet?
What If You Build a “Phase 1 House” First—Not Your Full Dream House Yet?

Comments

Couldn’t Load Comments
It looks like there was a technical problem. Try reconnecting or refreshing the page.

Contact Us

Wallpro Systems & Const Inc

2F RPM Bldg. Golden Glow North Commercial Macapagal Rd., Upper Carmen Cagayan de Oro

9000, Philippines

+63917-5156755

OPENING HOURS

Mon - Fri: 8:00 AM - 5:00 PM

Sat: 8:00 AM - 12:00 PM

© 2023 by Wallpro Systems & Construction Inc. All rights reserved.

Thanks for submitting!

bottom of page