What’s the cost per sqm—and what’s included/excluded?

Ever noticed how “₱___/sqm” sounds affordable… until the “hindi kasama” hits you like a truck?

Cost per sqm is only useful if you’re comparing the same scope. Most quotes differ because one includes essentials (waterproofing, ceilings, better fixtures, siteworks), while another hides them as future add-ons.


Solution (the only safe way to compare):

  • Demand a Written Inclusions/Exclusions Matrix (line-by-line)

  • Require a BOQ-style breakdown (structure, roofing, plumbing, electrical, finishes, siteworks)

  • Standardize the finish tier (Basic / Standard / Premium) before quoting

  • Identify “hidden-cost zones”: permits, excavation/hauling, drainage, waterproofing, septic, electrical upgrades, cabinets

If it’s not written, it’s not included. Period.


Want a copy-paste Inclusions/Exclusions Checklist to expose hidden add-ons fast? Comment/DM “INCLUSIONS”.

What’s the cost per sqm—and what’s included/excluded?
What’s the cost per sqm—and what’s included/excluded?

Recent Posts

See All
2026 CDO cost ranges (construction only, ₱/sqm)

Tier What it really means 2026 CDO planning range (₱/sqm) BARE “Shell” / rough-in ready (not livable finish) ₱21,000 – ₱26,000   (planning) BASIC Livable, simple finishes ₱26,000 – ₱30,000   STANDARD

 
 
 

Comments


Contact Us

Wallpro Systems & Const Inc

2F RPM Bldg. Golden Glow North Commercial Macapagal Rd., Upper Carmen Cagayan de Oro

9000, Philippines

+63917-5156755

OPENING HOURS

Mon - Fri: 8:00 AM - 5:00 PM

Sat: 8:00 AM - 12:00 PM

© 2023 by Wallpro Systems & Construction Inc. All rights reserved.

Thanks for submitting!

bottom of page